Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: DP12-0183

Parcel: Unknown


Addresses:

6310 E BROADWAY BL

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
06/06/2013 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 -
05/15/2013 PDSD Engineering Division Pre-Construction SITE MRUSSO Partial Approval Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT (CHUCK - GILBANE CONSTR 602-690-9898) DISCUSSED STORM WATER REQUIREMENTS. 2) CONTRACTOR HAS STARTED TO OVER EXCAVATE THE BLDG PAD FOR THE PROJECT. 3) INSTALL SEDIMENT CONTROLS PER YOU SWPPP 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT AT ALL ENTRANCES/EXITS ON SITE 5)POST A COPY OF YOUR SIGNED NOI AT ENTRANCE TO SITE 6) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS SCHEDULE A PRE-CON MEETING ASAP