| 06/06/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 05/15/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Partial Approval |
Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT (CHUCK - GILBANE CONSTR 602-690-9898) DISCUSSED STORM WATER REQUIREMENTS.
2) CONTRACTOR HAS STARTED TO OVER EXCAVATE THE BLDG PAD FOR THE PROJECT.
3) INSTALL SEDIMENT CONTROLS PER YOU SWPPP
4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT AT ALL ENTRANCES/EXITS ON SITE
5)POST A COPY OF YOUR SIGNED NOI AT ENTRANCE TO SITE
6) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS
SCHEDULE A PRE-CON MEETING ASAP |