Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/28/2014 |
SITE - Stormwater Setup and Controls |
kmedina |
Approved |
Entered by KMEDINA1 - |
| 06/19/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - PERIMETER SEDIMENT CONTROLS HAVE BEEN INSTALLED
ENSURE TRACKING IS SWEPT ON A ROUTINE BASIS
|
| 06/06/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Partial Approval |
Entered by DROBERT5 - 1) ENSURE SEDIMENT CONTROLS ARE IN PLACE AND MAINTAINED THROUGHOUT CONSTRUCTION.
2) USE THE INSTALLED STABILIZED CONSTRUCTION ENTRANCE/EXIT OR INSTALL ONE WHERE CONSTRUCTION TRAFFIC IS ENTERING/EXITING THE SITE.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
4) SWEEP UP TRACKING ROUTINELY
5) REPLACE MISSING AND/OR DAMAGED SILT SOCK |