Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP12-0183
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/16/2019 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
05/16/2019 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
05/16/2019 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/03/2013 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
09/26/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR PAVING PARKING LOT AND COMPLETING CONCRETE WORK AROUND THE BLDG. ENSURE SITE WORK IS COMPLETED PRIOR TO FINAL APPROVAL |
09/17/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - INSPECTED RUN SLOPE OF SIDE WALK FROM ROW TO BLDG. SLOPE AT 5%. CONTRACTOR PREPPING FOR PAVING |
08/30/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS |
08/28/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CURB AND CURB OPENINGS HAVE BEEN CONSTRUCTED 2) SOME SIDEWALKS HAS BEEN INSTALLED. ENSURE RUN SLOPES DO NOT EXCEED 5% AND CROSS SLOPES 2%. 3) THE TRASH ENCLOSURE HAS BEEN BUILT PER PLAN. 4) PAVING PARKING AND ACCESS NEXT WEEK |
07/31/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR ROUGHED IN BLDG PADS CONTRACTOR INSTALLED CURB AND SOME SITE WORK CALL FOR RE-INSPECTION FOR ANY CHANGES AND OR CONCERNS |
07/10/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 2) SWEEP UP TRACKED SOIL AS NEEDED 3) NO SIGNIFICANT SITE WORK AT THIS TIME |
07/08/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT SITE WORK AT THIS TIME. CONTRACTOR WORKING ON BLDG PAD. 2) ENSURE TRACKING IS SWEPT UP ROUTINELY. 3) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION |
06/19/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT SITE WORK BEING CONSTRUCTED AT THIS TIME |