Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP12-0183
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/26/2013 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by DROBERT5 - MAJORITY OF CONSTRUCTION SITE HAS BEEN PAVED/STABILIZED. CONTRACTOR PAVING PARKING LOT. |
09/17/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
08/30/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
08/28/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR HAS ROUGHED IN WATER HARVESTING BASINS ALONG THE PROPERTY PERIMETER. HE HAS REMOVED TEMP SEDIMENT CONTROLS. BASINS WILL BE USED TO CATCH ANY SILT RUN OFF UNTIL THE SITE IS 100% STABILIZED 2) ENSURE CHANGES ARE DOCUMENTED AND ROUTINE STORM WATER SELF INSPECTONS ARE CONTINUED 3) ENMPTY YOUR CONCRETE/MATERIALS WASH OUT AS NEEDED |
07/31/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER YOUR SWPPP 2) AS LONG AS SEDIMENT CONTROLS AR IN PLACE THEY MUST BE INSTALLED PROPERLY 3) ENSURE STORM WATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED 4) USE YOUR CONCRETE WASH OUT ON SITE 5) SWEEP UP TRACKED SOILSEDIMENT CONTROLS MUST BE IN PLACE UNTIL THE SITE IS STABILIZED |
07/10/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 2) SWEEP UP TRACKED SOIL AS NEEDED 3) NO SIGNIFICANT SITE WORK AT THIS TIME |
07/08/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT SITE WORK AT THIS TIME. CONTRACTOR WORKING ON BLDG PAD. 2) ENSURE TRACKING IS SWEPT UP ROUTINELY. 3) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION |
06/19/2013 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - PERIMETER SEDIMENT CONTROLS HAVE BEEN INSTALLED ENSURE TRACKING IS SWEPT ON A ROUTINE BASIS |