Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/22/2017 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - LOT #6 MUST BE COMPLET BEFORE PHASE #2 CAN BE FINALED. |
| 11/21/2017 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by DROBERT5 - COMPLETE THE SITE AS SHWON ON THE APPROVED PLANS, AND PROVIDE A SET OF APPROVED REVISED DRAWINGS FOR THIS SITE IF THERE HAVE BEEN ANY CHANGES MADE SINCE THE LAST REVISIONS. PROVIDE A CERTICATION LETTER FROM THE ENGINEER OF RECORD STATING THAT THIS SITE HAS BEEN COMPLETED PER THE APPROVED PLANS. ENSURE ALL ITEMS HAVE BEEN COMPLETED PRIOR TO REQUESTING ANOTHER FINAL INSPECTION. |
| 07/11/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |