Date Description Inspector Results Comments
09/13/2013 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/26/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) CHANGES MADE TO PARKING LOT - REMOVED TWO PARKING SPOTS TO ALLOW FOR BACK UP. PERIMETER BLOCK WALL IS IN DIFFERENT LOCATION THAN PLANS SHOW. 2) HANGE TO CURB CONFIGURATION TO ALLOW FOR MORE ROOM. 3) PROVIDE AS-BUILT SHOWING CHANGES MADE. 4) PROVIDE APPROVAL FORM COT ZONING (DSMR ?)
09/13/2013 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/26/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) CHANGES MADE TO PARKING LOT - REMOVED TWO PARKING SPOTS TO ALLOW FOR BACK UP. PERIMETER BLOCK WALL IS IN DIFFERENT LOCATION THAN PLANS SHOW. 2) HANGE TO CURB CONFIGURATION TO ALLOW FOR MORE ROOM. 3) PROVIDE AS-BUILT SHOWING CHANGES MADE. 4) PROVIDE APPROVAL FORM COT ZONING (DSMR ?)
08/23/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - SPOKE WITH SUPERINTENDENT, CONCERNS FOR PARKING AND ACCESS
08/16/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - PHASE II OF CONSTRUCTION TO START NEXT WEEK. HOUSE HAS BEEN DEMO'D AND CONSTRUCTION ON THE NEW PARKING AREA WILL START. ENSURE SAFE ACCESS IS PROVIDED TO OCCUPANTS WHILE PHASE II CONSTRUCTION IS ACTIVE
07/12/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - SECOND PHASE OF PROJECT WILL BE DONE AFTER PHASE I IS OCCUPIED
03/20/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME
02/22/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - SITE IS ACTIVE, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. CONTRACTOR WORKING ON BLDG, NO SIGNIFICANT SITE WORK AT THIS TIME