Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/17/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS ALONG THE NE AND NORTH SIDE OF SITE
2) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP
3) POST A COPY OF YOUR SIGNED NOI ON SITE
4) INSTALL A STABILIZED CONSTRUCTION ENTRANCES/EXITS PER PLAN
5) SWEEP UP TRACKED SOIL ROUTINELY
6) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE |