Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: DP12-0089

Parcel: Unknown


Addresses:

504 E 9TH ST

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
06/17/2013 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS ALONG THE NE AND NORTH SIDE OF SITE 2) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP 3) POST A COPY OF YOUR SIGNED NOI ON SITE 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCES/EXITS PER PLAN 5) SWEEP UP TRACKED SOIL ROUTINELY 6) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE