Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP12-0089

Parcel: Unknown


Addresses:

504 E 9TH ST

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
06/17/2013 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS ALONG THE NE AND NORTH SIDE OF SITE 2) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP 3) POST A COPY OF YOUR SIGNED NOI ON SITE 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCES/EXITS PER PLAN 5) SWEEP UP TRACKED SOIL ROUTINELY 6) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE