Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 06/10/2014 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 06/26/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - SOME SEDIMENT CONTROLS IN PLACE, HOWEVER SOME ARE NOT INSTALLED CORRECTLY.
|
| 06/20/2013 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Partial Approval |
Entered by DROBERT5 - CORRECTION REQUIRED:
1) INSTALL SEDIMENT CONTROLS PER PRE-CON MEETING
2) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAYS
3) POSTA A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
CORRECT WITHIN 7 WORKING DAYS
NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION |