Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/05/2014 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 07/24/2014 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CONTRACTOR HAS WORKED ON CORRECTING SLOPE FOR HC PARKING. PARKING NEEDS TO BE STRIPED
2) STORM CATCH BASINS HAVE BEEN CLEANED OUT
3) SIDEWALK SCUPPER HAS BEEN INSTALLED.
4) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD |
| 07/11/2014 |
ENGR Engineering Final
|
MRUSSO |
Prior to Final Inspectn |
Entered by DROBERT5 - 1) ENSURE ALL HC PARKING SPACES MEET ANSI/ADA REQUIREMENTS FOR SLOPE AND DIMENSIONS. PER ANSI/ICC A117.3 AND ADA PARKING SPACES AND ACCESS AISLES SERVING THEM MUST HAVE SURFACE SLOPES NO GREATER THAN 2% IN ANY DIRECTION. ALL HC PARKING SPACES EXCEPT FOR TWO DO NOT MEET SLOPE REQUIREMENTS, ONE VAN ACCESSIBLE SPOT ACCESS AISLE NEEDS TO BE 8 FEET WIDE INSTEAD OF 5 FEET.
2) THREE DOWN SPOUTS ON SITE DROP ONTO SIDEWALKS - PER COT DEV STD. A 10 YEAR EVENT MUST BE ROUTED UNDER SIDEWALKS; A DOWN SPOUT IS CONSIDERED A 10 YEAR EVENT.
3) COMPLETE ALL LANDSCAPING AND SITE WORK.
4) COMPLETE ALL PUNCHLIST ITEMS LISTED ON FINAL GRADING INSPECTION PERFORMED 6/19/2014.
5) CALL FOR INSPECTION WHEN COMPLETE.
|
| 06/19/2014 |
ENGR Engineering Final
|
MRUSSO |
Prior to Final Inspectn |
Entered by DROBERT5 - 1) PRIOR TO FINAL GRADING APPROVAL PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STAING THAT THE SITE/GRADING WAS COMPLETED PER THE APPROVED PLANS.
2) PROVIDE AN AS-BUILT DRAWING
3) COMPLETE ALL SITE/GRADING PER THE APPROVED PLANS
4) FILE A NOTICE OF TERMINATION FOR YOUR STORM WATER PERMIT WITH ADEQ.
5) CLEAN OUT CONSTRUCTION DEBRIS AND SOIL FROM ALL EXITING AND NEW STORM DRAIN CATCH BASINS |
| 03/18/2014 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) THE SITE UNDER A STORM WATER PERMIT UNTIL THE SITE IS 100% STABILIZED.
2) RE-ESTABLISH PERIMETER SEDIMENT CONTROLS
3) HAVE A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE
4) PROVIDE A STABILIZED CONSTRUCTION ENTRANCE OR ENTRANCES ON SITE
5) PRIOR TO FINAL GRADING APPROVAL:
- PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD
- CLEAN OUT EXISTING STORM DRAIN SYSTEM
- COMPLETE ALL SITE WORK SHOWN ON THE APPROVED PLANS
- PROVIDE AN AS-BUILT DRAWING FOR FINAL INSPECTION |