Permit: DP12-0089

Parcel: Unknown


Addresses:

504 E 9TH ST

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
08/05/2014 ENGR Engineering Final MRUSSO Approved Entered by DROBERT5 -
07/24/2014 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR HAS WORKED ON CORRECTING SLOPE FOR HC PARKING. PARKING NEEDS TO BE STRIPED 2) STORM CATCH BASINS HAVE BEEN CLEANED OUT 3) SIDEWALK SCUPPER HAS BEEN INSTALLED. 4) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD
07/11/2014 ENGR Engineering Final MRUSSO Prior to Final Inspectn Entered by DROBERT5 - 1) ENSURE ALL HC PARKING SPACES MEET ANSI/ADA REQUIREMENTS FOR SLOPE AND DIMENSIONS. PER ANSI/ICC A117.3 AND ADA PARKING SPACES AND ACCESS AISLES SERVING THEM MUST HAVE SURFACE SLOPES NO GREATER THAN 2% IN ANY DIRECTION. ALL HC PARKING SPACES EXCEPT FOR TWO DO NOT MEET SLOPE REQUIREMENTS, ONE VAN ACCESSIBLE SPOT ACCESS AISLE NEEDS TO BE 8 FEET WIDE INSTEAD OF 5 FEET. 2) THREE DOWN SPOUTS ON SITE DROP ONTO SIDEWALKS - PER COT DEV STD. A 10 YEAR EVENT MUST BE ROUTED UNDER SIDEWALKS; A DOWN SPOUT IS CONSIDERED A 10 YEAR EVENT. 3) COMPLETE ALL LANDSCAPING AND SITE WORK. 4) COMPLETE ALL PUNCHLIST ITEMS LISTED ON FINAL GRADING INSPECTION PERFORMED 6/19/2014. 5) CALL FOR INSPECTION WHEN COMPLETE.
06/19/2014 ENGR Engineering Final MRUSSO Prior to Final Inspectn Entered by DROBERT5 - 1) PRIOR TO FINAL GRADING APPROVAL PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STAING THAT THE SITE/GRADING WAS COMPLETED PER THE APPROVED PLANS. 2) PROVIDE AN AS-BUILT DRAWING 3) COMPLETE ALL SITE/GRADING PER THE APPROVED PLANS 4) FILE A NOTICE OF TERMINATION FOR YOUR STORM WATER PERMIT WITH ADEQ. 5) CLEAN OUT CONSTRUCTION DEBRIS AND SOIL FROM ALL EXITING AND NEW STORM DRAIN CATCH BASINS
03/18/2014 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - 1) THE SITE UNDER A STORM WATER PERMIT UNTIL THE SITE IS 100% STABILIZED. 2) RE-ESTABLISH PERIMETER SEDIMENT CONTROLS 3) HAVE A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE 4) PROVIDE A STABILIZED CONSTRUCTION ENTRANCE OR ENTRANCES ON SITE 5) PRIOR TO FINAL GRADING APPROVAL: - PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD - CLEAN OUT EXISTING STORM DRAIN SYSTEM - COMPLETE ALL SITE WORK SHOWN ON THE APPROVED PLANS - PROVIDE AN AS-BUILT DRAWING FOR FINAL INSPECTION