Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/18/2016 |
ENGR Grading Final |
DROBERTS |
Denied |
Entered by DROBERT5 - ARRIVED ONSITE AT 3:00, THE SITE IS LOCKED AND THE TRASH ENCLOSURE FOOTER HAS ALREADY BEEN POURED. THE CONTRACTOR HAS BEEN ASKED TO PROVIDE ME THE SPECIAL INSPECTION REPORT FOR THE APPROVAL OF THE FOOTER FOR THE FOOTER. |
| 04/21/2016 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - THE SPECIAL INSPECTION REPORT FROM THE SPEEDIE AND ASSOCIATES HAS BEEN PROVIDED AND PUT INTO THE FILES FOR THE APPROVAL OF THIS ITEM. |
| 11/14/2016 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 10/24/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC WENT OVER SIDE WALKS AND PARKING AREAS OVER SLOPE. |
| 10/11/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE ITH GC WENT OVER ADA PARKING AREAS. |
| 10/06/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT ADA PARKING RAEA AND PHYSILAL SEPARATION. ON WEST SIDE OF SITE. |
| 09/06/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE WITH GC CHECKED CROSS SLOPES ON NOTH EAST AND SOUTH EAST SIDEWALKS ONLY. CHECKED ADA PARKING AREA ON WEST SIDE OF BUILDING SOME OVER 2% SLOPES. |
| 08/29/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - STORM WATER PIPING PER HIGH LIGHTS ON PAGE C302-20. |
| 08/26/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - STORM WATER PIPING PER HIGH LIGHTS ON PAGE C302. |
| 08/10/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT SWPPP CONTROL ON SOTH SIDE OF SITE. |
| 07/20/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE WITH GC. GABION WALL INSTALLED PER REVISE. |
| 06/28/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE SIDE WALKS WITH GC THAT NEED TO BE REPAIRED. |
| 06/15/2016 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 05/19/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - HIGH LIGHTS ON AP PLANS. |
| 05/05/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - PER HIGH LIGHTS ON PAGE C302-20. |
| 05/04/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - PER HIGH LIGHTS ON PAGE C302-20. |
| 04/14/2016 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - 1) CREWS WORKED ON THE INSTALLATION OF THE HDPE ON THE NORTH WEST SIDE OF THE QUADRANT.
2) THE TRASH ENCLOSURE FOOTER HAS BEEN COMPLETED AT THIS TIME ALSO. |
| 04/29/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - STORMWATER PIPING PER HIGH LIGHTS ON AP PLANS. |
| 04/21/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - PER HIGH LIGHTS ON PAGE C301-19. |
| 04/08/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - |
| 04/05/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON AP PALNS. |
| 03/31/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - HIGH LIGHTS ON AP POLANS FOR STORM WATER PIPING. |
| 03/18/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - INSPECTION PER HIGHLIGHT ON AP PLANS. |
| 03/17/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - STROM DRAIN PIPING PER HIGH LIGHTS ON AP PLANS. |
| 12/15/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON GRADING EAST END . NO CONCERNS AT THIS TIME. |
| 11/16/2016 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 12/23/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 12/18/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON BUILDING PADS. |
| 12/18/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - |
| 12/18/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC . NO CONCERNS AT THIS TIME. |
| 12/10/2015 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - PICKED UP NOI FROM GC. WORKING ON OVER XING SITE. |
| 11/28/2016 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |