Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 10/25/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 10/05/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT TIME. |
| 08/31/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS. |
| 07/14/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 06/21/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - GOT WITH GC ABOUT CLEANING OUT STROM DRAIN PIPING. |
| 05/25/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT ON STREETS. |
| 05/02/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - |
| 03/02/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - METWITH GC ABOUT WASH OUT AND TRACK OUT . WENT OVER AP PLANS FOR STORM DRAIN PIPING AND CATCH BASIN. |
| 02/10/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 02/05/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT INSTALLING SIGNS FOR WAH OUT. |
| 01/29/2016 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE WITH GC HE NEEDS TO ADD SIGNS AT WASH OUT AND PROVIDE PROTECTION AT CONCRETE PLANT. |