Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/28/2016 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 11/22/2016 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 11/17/2016 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 11/16/2016 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - COMPLET ALL NOTES FROM PAST INSPECTIONS FOR FINAL. |
| 11/14/2016 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - TREE PLANTING PER PAGE L1-38 A. CLEAN AREA ON SOUTH SIDE OF SITE . ADA PARKING OVER 2% . COMPLET INSTALL OF BARRIERS AT BUILDING ENTRY. PROVIDE CERT LETTER FOR ALL GRADING AND DRAINAGE FROM ENGINEER OF RECORD. |
| 11/07/2016 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CHANGE TO ADA PARKING FROM LAST INSPECTION. |
| 10/25/2016 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ON SITE WENT OVER ADA PARKING AREAS OVER 2%. GC NEEDS TO POVIDE PHYSICAL SEPARATION AT MAIN ENTRANCE. COPLET ALL LANDSCAPING.COMPLET REPAIRS OF SIDE WALKS AND CROSS WALKS ON STREET. OVER 2%. |