Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP12-0030
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/05/2012 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Approved | Entered by DROBERT5 - MET WITH MIKE BRADLEY AND DISCUSS THE FUTURE INTENTIONS FOR THIS SITE ARE AND WHEN WORK IS EXPECTED TO START. HE IS ADVISING ME THAT HE DOESN'T THINK THAT THERE ARE ANY TREES THAT HAVE TO BE SAVED FOR THE NPPO, I ADVISED HIM THAT I WILL CHECK ON THIS BEFORE THEY START THE DEMOLITION OF THE PLANTS. HE WILL HAVE THE CONSTRUCTION FENCE PLACE EITHER TOMORROW OR BY MONDAY AND IS PLANNING ON STARTING THE PAVEMENT DEMOLITION ON FRIDAY 7/6/2012. HE ADVISES THAT IF THERE ARE ANY ISSUES WITH THE SITE HE CAN EITHER BE REACHED AT (602) 840-7700 OR BY HIS CELL PHONE (602) 828-6128. |