Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2012 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/13/2012 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON CURBING ON NORTH SIDE OF BUILDING. |
| 08/07/2012 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.NO GRADING ACTIVITY. |
| 07/16/2012 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS. |
| 07/10/2012 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 07/03/2012 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS. |
| 06/22/2012 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - GOT WITH CONTRATOR. TO COMPLET HAND OUT. |
| 06/15/2012 |
ENGR Grading Final |
RLEDONNE |
Denied |
Entered by RLEDONN1 - GOT WITH DAVID YOUNG FROM EAGLE ROCK WALKED JOB SITE TALKED ABOUT CALLING FOR PER CON MEETING BEFORE WORK STARTS. |
| 11/07/2012 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/23/2012 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - CREWS WORKING ON PLACING THE EXTERIOR MATERIAL ON THE WEST SIDE OF THE BUILDING, THEY HAVE ALSO STARTED ON THE EAST SIDE OF THE BUILDING. A CREW IS TRENCHING FOR DRAINAGE PIPE AND IS PLACING SOME OF THE 12 INCH HDPE PIPE AT THE NORTH WEST SIDE OF THE SITE. MINOR MODIFICATIONS MAY HAVE TO BE MADE TO THE LAYOUT DUE TO FOOTERS THAT HAVE ALREADY BEEN POURED ON THE NORTHSIDE OF THE BUILDING, THESE WILL BE NOTED IN THE AS-BUILT DRAWINGS AS NEEDED. |
| 08/16/2012 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - WALKED THE SITE WITH THE CONTRACTOR AND LOOKED AT THE CURRENT WORK THAT THEY ARE PEROFRMING. CURRENTLY THEY ARE INSTALLING SOME OF THE DRAINAGE PIPE LOCATED IN THE SOUTHWEST CORNER OF THE SITE, THIS WILL BE BACKFILLED TODAY. ADDITIONAL PIPES WILL BE PLACE LATER THIS WEEK AND NEXT WEEK AND WILL BE SCHEDULED FOR INSPECTION AS THEY ARE NEEDED. ALSO CREWS CONTINUE TO WORK ON INSTALLING THE SUPPORTING STRUCTURES OF THE SITE AND ARE ANTICIPATING BEING ABLE TO START SKINNING THE BUILDING FRAME WITHIN THE NEXT 2 WEEKS. THE CONTRACTOR SAYS THAT HE WILL BE ASKING FOR HIS FINAL INSPECTIONS EITHER THE LAST WEEK OF SEPTEMBER OR THE FIRST WEEK OF OCTOBER. I HAVE REMINDED THEM THAT THERE IS STILL AN ISSUE WITH THE REMOVAL OF THE BILLBOARD FROM THIS SITE AS SHOWN ON THE APPROVED SET OF PLANS, AND IF THIS WORK HAS NOT BEEN COMPLETED BY THE TIME THAT THEY ARE CALLING IN THEIR FINAL INSPECTIONS THAT I MIGHT HAVE TO DENIE THE APPROVALS UNTIL THE BILLBOARD IS REMOVED. HE WILL BE HAVING A MEETING WITH THE OWNER THIS AFTER AND WILL BRING THAT ISSUE TO HIS ATTENTION TO MAKE SURE THAT THEY ARE AWARE OF PROBLEMS WITH FUTURE REQUEST FOR FINAL RELEASES. |