Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/10/2020 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/21/2017 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - PROVIDE THE AS-BUILT/REVISED DRAWINGS FOR ALL THE CHANGES MADE TO THIS SITE, AND A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD PRIOR TO SCHEDULING THE FINAL INSPECTION FOR THIS SITE. |
| 04/02/2013 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - WAITING FOR THE CONTRACTOR TO COMPLETE ALL THE WORK ON THE APPROVED PLANS OR TO PROVIDE AN APPROVED SET OF REVISED DRAWINGS FOR THE FINAL INSPECTION. |
| 04/02/2013 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by DROBERT5 - CHECKED THE SITE TOO SEE IF ALL THE WORK HAD BEEN COMPLETED AT THIS TIME. |