Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP11-0017
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/31/2012 | ENGR Grading Final | jgreen | Approved | Entered by JGREEN2 - Sheets 4 and 5 have been submitted to show the minor grade changes and the relocation of the sewer line around an existing electrical pole. Revisions are a Tier 1 process. Plan sheets are approved. JG |
08/21/2012 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - NOTHING REQUIRED AT THIS TIME. |
09/10/2012 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/21/2012 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - LOOKED OVER THE SITE CREWS ARE WORKING ON THE BUILDING CONSTRUCTION, SUBGRADE PREPARATIONS, GRADING AND COMPACTION. ABC IS SCHEDULED TO BE PLACED ON WEDNESDAY AND THURSDAY OF THIS WITH PAVEMENT PLACEMENT TO FOLLOW ON THURSDAY AND FRIDAY OF THIS WEEK. |
08/03/2012 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - STOPPED BY AND MET WITH THE CONTRACTOR TOO DISCUSS SOME ISSUES ON THE SITE THAT WILL NEED TO BE ADDRESSED. HE WILL NEED TO ADDRESS THE STORMWATER CONTROLS, THE TRASH ENCLOSURE IS SLIGHTLY UNDERSIZED AND WILL NEED TO BE APPROVED BY THE AREA SUPERVISOR FOR ENVIRONMENTAL SERVICES BEFORE IT WILL BE ACCEPTED AND APPROVED BY THIS DEPARTMENT. I WILL RETURN TO THE SITE LATE NEXT WEEK TO CHECK ALL OF THE SIDEWALKS AND ADA ACCESS RAMPS ON THIS SITE, IF ANY CORRECTIONS ARE NEEDED THEY HAVE TIME TO MAKE THE CORRECTIONS PRIOR TO PAVING THE FOLLOWING WEEK. |
07/12/2012 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THIS SITE HAS BEEN KEPT CLEAN OUTSIDE OF THE CONSTRUCTION FENCE, MINOR EROSION OF STOCKPILES HAVE BEEN NOTED WITHIN THE CONSTRUCTION AREA. CREWS CONTINUE TO WORK ON THE BUILDING CONSTRUCTION BUT HAVE NOT STARTED TOO MUCH SITE WORK AT THIS TIME. |
06/27/2012 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - PRE-CON MEETING WITH SUPERINTENDENT A MONTH AGO. UNABLE TO ENTER INSPECTIONS DUE TO DEV PACKAGE COMPUTER PROGRAM GLITCH. REVIEWED SWPPP REQUIREMENTS AND GRADING PLANS. NO IMMEDIATE STORM WATER CONCERNS, HOWEVER CONTRACTOR MUST MAKE EVERY ATTEMPT TO KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION. |