Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: D04-0019

Parcel: Unknown


Addresses:

7575 S HOUGHTON RD


Inspection Status: Not Ready

Inspection History: COT - ENGR - Site - Assurance Release

Permit Number - D04-0019

Inspection Description - COT - ENGR - Site - Assurance Release

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 COT - ENGR - Site - Assurance Release Not Ready
10/26/2022 COT - ENGR - Site - Assurance Release Not Ready
10/26/2022 COT - ENGR - Site - Assurance Release Not Ready
04/30/2007 COT - ENGR - Site - Assurance Release TSTOCKET Denied Entered by ASHOFFS1 - 1. The "Right Only" (R3-5R) sign and the square tube post are missing from the foundation at Station 18 + 53, the beginning of the right turn lane. 2. The following signs and post are being required in addition to those shown on the plans: " A "Stop" (R1-1/30" x 30") sign and post is being required at the driveway exiting the parking lot onto Houghton Road at Station 18 + 58. " The two (2) "Right Only" sign and posts for northbound traffic in the right turn lane of Houghton Road need to have "Right Lane" (R3-5F/30" x 12") signs attached to the posts. Please complete these requests, as soon as possible, so that we may release your Traffic Engineering obligation and forward our recommendation for your project's acceptance.