Case: CE-VIO1025-04799

Parcel: 136343360


Addresses:

7260 E FAYETTE ST

Inspection Status: In Violation

Inspection History: COT - ENFC - Code Enforcement - Follow Up

Date Description Inspector Results Comments
01/23/2026 COT - ENFC - Code Enforcement - Follow Up In Violation Renovation still underway, permits still need to be issued for electrical. Will follow up in 30 days.
02/25/2026 COT - ENFC - Code Enforcement - Follow Up In Violation Spoke with contact, renovation efforts are still underway. He is checking with his GC regarding electrical reconnect permit. Will extend 30 days.
03/27/2026 COT - ENFC - Code Enforcement - Follow Up In Violation Spoke with responsible party a couple weeks ago regarding steps needed to get electrical service back on, which requires permits. Extending 45 days for him to get permit process started.
COT - ENFC - Code Enforcement - Follow Up Scheduled
11/17/2025 COT - ENFC - Code Enforcement - Follow Up In Violation On site - Inside of house has been completely emptied and is no longer a hazard. The back yard has been cleaned up as well, just 2 JMVs remain in the front yard. SW Gas needs to do inspection still but I will lift the condemnation to allow electric to be turned on. Extend 2 more weeks.
12/02/2025 COT - ENFC - Code Enforcement - Follow Up In Violation Inside of home is clean and undergoing a remodel. Due to electrical work, a reconnect permit is required. POA is getting the electrical issues situated so they can get the permit and inspection. Will continue to follow up.
12/18/2025 COT - ENFC - Code Enforcement - Follow Up In Violation Spoke with power of attorney holder. Renovation of the house is underway, which includes buttoning up the electrical so they can get the reconnect permit. Will follow up in 2 weeks.