Inspection Status: Completed
Inspection History: COT - ENFC - Code Enforcement - Follow Up
Case Number - CE-VIO0924-03619
Inspection Description - COT - ENFC - Code Enforcement - Follow Up
Inspection Status - Completed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2025 | COT - ENFC - Code Enforcement - Follow Up | Completed | TR-ROW-0924-01049 Completed. close case | |
| 09/11/2024 | COT - ENFC - Code Enforcement - Follow Up | Completed | Construction Inspector for Transportation sent out a message regarding the raw sewage has once again flooded into the parking lot and on into the street area. Met with Construction Inspector, Plumber. Plumber and Construction Inspector explain in order to repair the problem with the plumbing system the water to building H, I has be turned off. The area where the plumbing line is located will need to be excavated. The sewer line is not connected to the County sewage system and needs to be connected. Doing this will take several hours to repair. Not exactly sure how long this will be before water will be turned back on to the buildings. 6 rental units affected by this plumbing issue. Met w/Property Management. Explained if the water is not turned back on occupants need to be relocated till services come back on. | |
| 07/09/2025 | COT - ENFC - Code Enforcement - Follow Up | Completed | Met w/City of Tucson Transportation Construction Inspector, Plumber hired to make repair to the plumbing system. Sewer pipe has shifted and is causing the blockage of sewage in the street near the area the sewer line is suppose to tye into the County sewer line. Building B & C both are being shut down due to the water line service being cut to this location to allow for the Plumber to make repairs to the sewer line. Occupants relocated. Meeting set to meet with upper property management, Plumber, Transportation Construction Inspector, County and Streets. To coordinate the repair to the sewer line located in the street. At this time I want to know when will services be fully restore back to the property. I will also require owner submit current plans to PDSD identifying the current configuration of the plumbing system. Current plumbing plan on file does not match the current system. | |
| 09/12/2024 | COT - ENFC - Code Enforcement - Follow Up | Completed | Issued nov to submit current plumbing plans to PDSD. | |
| 07/09/2025 | COT - ENFC - Code Enforcement - Follow Up | Completed | Damaged plumbing located in the roadway has been repaired under permit. Construction Manager needs to submit updated plumbing plans to PDSD identifying the changes to the old plumbing plan on file with the city. Once this has been submitted and is on file. Case will be closed. | |
| 07/09/2025 | COT - ENFC - Code Enforcement - Follow Up | Completed | CMS hired Alta Engineering to submit updated plans to PDSD identifying where the sewer lines are actually located on the property. Old plans on file were incorrect. |