Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: In Violation
Inspection History: COT - ENFC - Code Enforcement - Initial
Case Number - CE-VIO0423-02919
Inspection Description - COT - ENFC - Code Enforcement - Initial
Inspection Status - In Violation
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2023 | COT - ENFC - Code Enforcement - Initial | In Violation | Flooring in school was lifting and outside building a crack formed. Interior walls showed some cracking in the drywall and the cement in the hall way near the water leak. Maintenance opened up the flooring to make an EMERGENCY REPAIR to the broken water line. A square/retangle cut in the cement flooring approximately 3 w x 4 w exposing the plumbing and dirt. Ground is wet, Maintenance leaving flooring open to allow the dirt in the ground to dry. Maintenance has contacted a Structural Engineer to address the cracking floor and building brick wall cracking. Permits will be obtained and will encompass the Structural Engineers recommendations to fix the flooring and structure. Maintenance states he will take safety measures to cover the floor to prevent potential of injury. Issue NOV Permits required. |