Inspection Status: Passed
Inspection History: COT - ENFC - Code Enforcement - Initial
| Date |
Description |
Inspector |
Results |
Comments |
| 04/12/2023 |
COT - ENFC - Code Enforcement - Initial |
|
Passed |
Stop by the office of the contractor and spoke to Gino Martino and has the approvals for March pouring and has April pours posted on the board. There was no crane but a concrete pump for the walls being poured for tilt panels. If the go into May will be getting the approvals before doing any pouring on site. Has 2-structures with the walls in place and starting to place the metal trusses and welding the panels together. At this time the case will be closed. Violation Abated, Close Case. RV. |