Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Completed
Inspection History: COT - ENFC - Code Enforcement - Initial
| Date |
Description |
Inspector |
Results |
Comments |
| 03/08/2023 |
COT - ENFC - Code Enforcement - Initial |
|
Completed |
ON SITE WITH TPD, TOWING COMPANY, EMPLOYEE OF FAST AUTO LOAN AND THE CITY BOARD UP CONTRACTOR. A VEHICLE IMPACTED THE SOUTHWEST SIDE OF THE COMMERCIAL BUILDING. TWO ESTIMATED 64X56 WINDOWS WERE DESTROYED AND THE METAL FRAMING WAS DAMAGED. ONE ESTIMATED 91X56 GLASS DOOR AND THE METAL FRAMING WAS DAMAGED. THE ESTIMATED 95X42 EXTERIOR BRICK WAS DESTROYED. THE ESTIMATED 95X42 CYNDER BLOCK OF THE INTERIOR WAS DESTROYED. THERE APPEARED TO BE NO ELECTRICAL IN THE AREA OF IMPACT. THE BUILDING WAS BOARDED BY THE CITY OF TUCSON. THE STAFF WAS NOTIFIED THAT PERMITS WOULD BE REQUIRED TO MAKE REPAIRS AND A COPY OF THE EMERGENCY ABATEMENT WAS SIGNED BY THE STAFF. |