Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 124050870

Addresses:


711 E 5TH ST

Inspection Details

Case Number - CE-VIO0223-01799

Status:
Date Description Inspector Status Comments
COT - ENFC - Code Enforcement - Initial Scheduled 711 E. 5TH ST Front door has been replaced, grey stucco around front door. Front window resized for a smaller window. Gate walk through area on the west side has been recently stucco'd. All windows replaced out from wooden windows to metal window frames. Entry doors on the west side have been enclosed. New plumbing pipe is poking out on the west side of the house indicating plumbing fixtures inside the rental units have been removed and replaced. Interior rooms appear to have upgraded electrical outlets. Facia removed and replaced new wood is visible. Rental property exterior has been re-stucco'd in the front end, side and back end of property. New electrical service at the back end of the rental property. Trenching for plumbing into rental units 711 and 713 E. 5th Street. Roofing appears to have been re-roofed. Old air conditioning units have been removed off the roof and replaced with upgraded equipment. Water heater closets are new. Gas water heaters at 711 and 713 E 5th St. appear to be recently replaced. Out-door security lights installed, junction box with newer conduit visible. Facia located on the east side of rental unit 713 E. 5th St has been recently replaced. 2 story rental unit located at the north end of property posted as 711 - 2 / 711 - B appears to have work without permits. Wooden window frames have been reduced in size and replaced with metal window frames or completely removed. Air-conditioning has been removed off the roof and is located on the east side of the rental building. Siding replaced with newer siding. Electrical service has been replaced. A newer air-conditioning is attached to the east side of building wall. Porch on the second floor reframed and painted. Facia on rental unit has been replaced. Security lighting installed to the exterior. Exterior door on the east side of rental unit replaced. All three units have been posted with STOP WORK postings and documented.