Case: T99VL02912
Case Details
Entered Date:
12/02/1999
Applicant:
SANCHEZ ELVIA M L
Description:
COMPLAINT:EMERGENCY CALLOUT - HOUSE FIRE
Outstanding Inspections
Case Number: T99VL02912
Case Status: COMPLIAN
Case Description: RES: FIRE
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/30/1999 | INITIAL CODE VIOLATION | RAIELLO | Violation | VIOLATION |
| 12/06/1999 | FOLLOW UP CODE VIOLATION | FGREER | Violation | VIOLATION |
Completed Activity Special Conditions
Case Description - RES: FIRE
Case Number - T99VL02912
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
| Date | Name |
| 12/03/1999 | 11/30/99 SITE VISIT/INSPECTION MADE TO AN EMERGENCY CALLOUT TO A HOUSE FIRE BY INSPECTOR R AIELLO PER TFD. NOTICE & ORDER INDEMNIFICATION SIGNED BY OWNER. SWG DISCONNECTED. DAMAGE TO ENTIRE WEST SIDE OF HOUSE AND ROOF. PLUS VENT CUTS THROUGH OUT ROOF. BUILDING: WEST SIDE STRUCTURE BURNED OUT, ROOF DESTROYED - SEVERAL CODE VIOLATIONS, NO SMOKE DETECTORS, STEEL BARS ON WINDOWS IN SLEEPING AREAS, NO HEATING AND COOLING TO SLEEPING AREA. ELECTRICAL, PLUMBING AND MECHANICAL DESTROYED. THIS IS A DUPLEX 901/903 S TYNDALL, BOTH HAVE SEVERAWL CODE VIOLATIONS IN BOTH UNITS. PLANS AND PERMITS REQUIRED AT 901 TO REBUILD AND CODE COMPLIANCE AT 903 S TYNDALL. SEE INSPECTION RESULTS AND NOTATIONS FOR SPECIFIC INFORMATION. FOLLOW UP SCHEDULED 12/6/99. 12/06/99 PER INSPECTOR F GREER, BUILDING SECURE. FOLLOW UP SCHEDULED 02/05/00. 02/07/00 BUILDING SECURE PER INSPECTOR F GREER. FOLLOW UP SCHEDULED FOR 05/09/00. 05/09/00 BUILDING SECURE PER INSPECTOR F GREER. 90-DAY FOLLOW UP SCHEDULED FOR 08/09/00. |