Case: T99VL02534
Case Details
Entered Date:
10/04/1999
Applicant:
ROBLES YOLANDA L & LOPEZ GEORGE
Description:
COMPLAINT: ILLEGAL ACCESSORY STRUCTURE W/O PERMITS
Outstanding Inspections
Case Number: T99VL02534
Case Status: COMPLIAN
Case Description: RES: BUILDING W/O PERMIT
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/1999 | INITIAL CODE VIOLATION | RCHAVEZ | Violation | VIOLATION |
Completed Inspections
Case Status: COMPLIAN
Case Number: T99VL02534
Case Description: RES: BUILDING W/O PERMIT
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2000 | FOLLOW UP CODE VIOLATION | FGREER | Approved | PERMIT OBTAINED |
Completed Activity Special Conditions
Case Description - RES: BUILDING W/O PERMIT
Case Number - T99VL02534
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 12/14/1999 | 12/14/99 NOTICE OF VIOLATION ISSUED TO OWNER VIA CERTIFIED MAIL Z551948003. 12/16/99 NOV SIGNED BY VINCENT EGURROLLA. FOLLOW UP SCHEDULED 01/06/00. 01/10/00 INSPECTOR R CHAVEZ CALLED AND LEFT A MESSAGE TO HAVE OWNER CALL BACK (882-4803). FOLLOW UP SCHEDULED 02/08/00. 02/28/00 INSPECTOR F GREER TALKED TO MR LOPEZ WHO IS TRYING TO GET LDO. FOLLOW UP SCHEDULED FOR 03/28/00. 04/04/00 PER INSPECTOR F GREER, PLANS IN PLANCHECK SINCE 03/16/00. 45-DAY FOLLOW UP SCHEDULED FOR 05/19/00. |
| 06/05/2000 | 5/24/00 INSPECTOR F.GREER HAS NOTED THAT OWNER HAS CALLED, (MR.ROBLES) AND SAID HE NEEDED MORE TIME. A 30 DAY EXTENSION HAS BEEN GIVEN. FOLLOW UP IS SCHEDULED FOR 6/26/00. RETURNED PACKET TO TICKLER FILE. 6/27/00 INSPECTOR F.GREER NOTED: PLANS HAVE BEEN APPROVED ON 6/19/00. WILL KEEP OPEN TILL PAYMENT IS RECEIVED. 30 DAY FOLLOW UP IS SCHEDULED ON 7/27/00. RETURNED PACKET TO TICKLER FILE. |
| 08/30/2000 | 07/03/00 PERMIT ISSUED - T00BU00808 |
| 08/30/2000 | 08/14/00 VIOLATION CLOSED/ABATED |