Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

RES: FIRE
Address:

Entered Date:

06/28/1999

Applicant:

GIBSON JOHN R

Description:

COMPLAINT:EMERGENCY FIRE CALL-OUT

Outstanding Inspections

Case Number: T99VL01679
Case Status: COMPLIAN
Case Description: RES: FIRE
Total Outstanding Inspections - 2
End Date Description Inspector Results Comments
06/24/1999 INITIAL CODE VIOLATION RAIELLO Violation VIOLATION
12/02/1999 FOLLOW UP CODE VIOLATION FGREER Violation VIOLATION

Completed Activity Special Conditions

Case Description - RES: FIRE
Case Number - T99VL01679
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
Date Name
06/28/1999 06/28/99 SITE VISIT/INSPECTION MADE. TUCSON FIRE DEPT ASKED TO HAVE A TRACK HOLE BROUGHT IN TO KNOCK THE STRUCTURE DOWN AND TURN IT OVER TO PUT OUT THE FIRE. HOME OWNER TOOK RESPONSIBLTY TO FENCE PROPERTY. FIRE WAS STARTED BY ARSON. ONE AUTO WAS DESTROYED AND A SECOND STORAGE SHED WITH HAZARDOUS MATERIAL WAS DAMAGED. AN APPROX 600 SQ FT BLDG WITH MOBILE HOME ATTACHED WAS COMPLETELY DESTORYED. THE ELECTRICAL WAS DISCONNECTED AT PANEL- COMPLETELY DESTROYED. THE PLUMBING WAS ALSO DISCONNECTED AND DESTROYED. WILL NEED PERMITS AND PLANS IF OWNER WANTS TO REBUILD. FOLLOW UP SCHEDULE FOR JUNE 29, 1999. INSPECTOR LEFT NOTICE AND ORDER AND INDEMNIFICATION THAT OWNER SIGNED WITH OWNER. 12/02/99 PER INSPECTOR F GREER, BUILDING SECURE. FOLLOW UP SCHEDULED 02/05/00 02/07/00 BUILDING SECURE PER INSPECTOR F GREER. FOLLOW UP SCHEDULED FOR 06/21/00. 6/22/00 INSPECTOR F.GREER NOTED THAT BUILDING IS SECURED. A 90 DAY FOLLOW UP IS SCHEDULED FOR 9/22/00. RETURNED PACKET TO TICKLER FILE.

Documents

File Name Document Type  
PHOTOS.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW