Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

CLOSED

Type:

RES: FIRE
Address:

Entered Date:

05/03/1999

Applicant:

MORENO FRANCISCA 50% & MUNIZ AND

Description:

COMPLAINT:EMERGENCY FIRE CALL OUT VIOLATION:COMPLETE SET OF DRAWINGS REQUIRED

Outstanding Inspections

Case Number: T99VL01335
Case Status: CLOSED
Case Description: RES: FIRE
Total Outstanding Inspections - 2
End Date Description Inspector Results Comments
05/03/1999 INITIAL CODE VIOLATION EDURAZO Violation VIOLATION
06/15/2000 FOLLOW UP CODE VIOLATION FGREER Violation 90 DAY F/U

Completed Activity Special Conditions

Case Description - RES: FIRE
Case Number - T99VL01335
Case Status: CLOSED
Total Completed Case Activity Conditions: 1
Date Name
05/03/1999 05/02/99 NOTICE AND ORDER INDEMNIFICATION SIGNED @ SITE. ON 5/2/99, A FIRE OCCURRED @ DETACHED STORAGE SHED, & DAMAGED THE RAFTERS, BEAM & PLYWOOD, ELECTRICAL DAMAGED. ISOLATED ELECTRICAL DAMAGE TO STORAGE ONLY. ADVISED OWNER TO OBTAIN ELECTRICAL SERVICE PANEL, BREAKER COVER. TWO COMPLETE SET OF DRAWINGS ARE REQUIRED. 10/12/99 FOLLOW UP SCHEDULED FOR 10/13/99 ORIGINAL PACKET RETURNED INTO TICKLER FILE DATES 10/13/99. 10/13/99 PER INSPECTOR RAUL CHAVEZ, BUILDING SECURE. FOLLOW UP 01/13/2000. 01/13/00 BUILDING SECURE PER INSPECTOR R CHAVEZ. FOLLOW UP SCHEDULED 03/13/00. 01/13/00 BUILDING SECURE PER INSPECTOR R CHAVEZ. FOLLOW UP SCHEDULED 03/13/00. 3/13/00 BUILDING IS SECURE PER INSPECTOR F. GREER. A 90 DAY FOLLOW UP IS SCHEDULED FOR 6/13/00. SENT PACKET TO TICKLER FILE. 6/15/00 INSPECTOR F.GREER NOTED THAT BUILDING WAS SECURED AND FENCED. FOLLOW UP IS SCHEDULED FOR 9/15/00. RETURNED PACKET TO TICKLER FILE.

Documents

File Name Document Type  
None DOCUMENTS VIEW