Case: T99VL01309
Case Details
Entered Date:
04/27/1999
Applicant:
TURKIN ABRAHAM D
Description:
COMPLAINT:HOUSE ADDITION
Outstanding Inspections
Case Number: T99VL01309
Case Status: SUSPNDED
Case Description: RES: BUILDING W/O PERMIT
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2000 | FOLLOW UP CODE VIOLATION | FGREER | Violation | 7-MO F/U |
| 12/16/1999 | INITIAL CODE VIOLATION | RCHAVEZ | Violation |
Completed Activity Special Conditions
Case Description - RES: BUILDING W/O PERMIT
Case Number - T99VL01309
Case Status: SUSPNDED
Total Completed Case Activity Conditions: 2
| Date | Name |
| 12/28/2001 | VIOLATION CLOSED. |
| 10/25/1999 | 10/25/99SITE VISIT/INSPECTION MADE. SEE INSPECTION RESULTS AND NOTATIONS FOR SPECIFIC INFORMATION.FOUND PACKET FOLLOW UP WAS TO BE SCHUELED FOR 07/23/99 PER INSPECTOR RCHAVEZ. SCHUELED FOLLOW UP FOR 10/26/99 RETURNED ORIGINAL PACKET INTO TICKLER DATED 10/26/99. 12/16/99 PER INSPECTOR R CHAVEZ. SAME STATUS, PERMIT WAS ISSUED, EXPIRED, OWNER WILL HAVE PERMIT REINSTATED AT A LATER DATE. NO VIOLATION, CONTINUE TO FOLLOW UP. SCHEDULED FOLLOW UP FOR 02/16/99. 02/16/00 PERMITS EXPIRED PER INSPECTOR F GREER. FOLLOW UP SCHEDULED FOR 03/31/00. 04/20/00 INSPECTOR F GREER SPOKE TO MR TURKIN WHO IS GOING INTO OPERATIONS AND ASKED FOR A TIME EXTENSION. 7-MO FOLLOW UP SCHEDULED FOR 11/20/00. |