Case: T99VL01229
Case Details
Entered Date:
04/20/1999
Applicant:
CORONADO ADELE MARIE
Description:
COMPLAINT:PORCH AT REAR OF HOUSE
Outstanding Inspections
Case Number: T99VL01229
Case Status: COMPLIAN
Case Description: RES: BUILDING W/O PERMIT
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/1999 | INITIAL CODE VIOLATION | CWHITE | Violation | PORCH |
Completed Inspections
Case Status: COMPLIAN
Case Number: T99VL01229
Case Description: RES: BUILDING W/O PERMIT
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/1999 | FOLLOW UP CODE VIOLATION | RCHAVEZ | Approved | VIOLATION |
Completed Activity Special Conditions
Case Description - RES: BUILDING W/O PERMIT
Case Number - T99VL01229
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
| Date | Name |
| 07/02/1999 | 07/2/99 NOTICE OF VIOLATION ISSUED: PORCH BUILT WITHOUT 8/23/99 PER INSPECTOR R.CHAVEZ OWNER IS IN THE PROCESS OF OBTAINING PERMITS EXTEND 30 DAYS FOLLOW UP SCHEDULED 9/27/99. 10/27/99 PER INSPECTOR R. CHAVEZ PERMIT SHOULD BE OBTAINED WITHIN 3O DAYS FOLLOW UP SCHEDULED FOR 11/29/99. 12/01/99 PER INSPECTOR R CHAVEZ, OWNER HAS OBTAINED HELP AND SHOULD HAVE DR 12/01/99 PER INSPECTOR R CHAVEZ, OWNER HAS OBTAINED HELP AND SHOULD HAVE DRAWINGS WITHIN 30 DAYS. FOLLOW UP SCHEDULED FOR 01/03/00. 03/20/00 INSPECTOR F GREER ASKED FOR FOLLOW UP IN 20 DAYS, SCHEDULED FOR 04/10/00. 4/10/00 WILL EXTEND THIS MATTER FOR 30 DAYS PER R.VIDAL FOLLOW UP IS SCHEDULED FOR 6/30/00. SENT PACKET TO TICKLER FILE. |
| 07/17/2000 | 07/11/00 PER INSPECTOR R VIDAL REPAIRS THAT WERE MADE TO EXISTING PORCH, VIOLATION ABATED. |