Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

CLOSED

Type:

RES: BUILDING W/O PERMIT

Entered Date:

08/11/1998

Applicant:

PONGRATZ ANDREW C & PONGRATZ EDM

Description:

COMPLAINT:EMERGENCY FIRE CALL OUT VIOLATION:PERMITS REQUIRED

Completed Inspections

Case Status: CLOSED
Case Number: T98VL00461
Case Description: RES: BUILDING W/O PERMIT
Total Completed Inspections - 2
End Date Description Inspector Results Comments
12/28/1998 INITIAL CODE VIOLATION EMONAHAN Approved VIOLATION
12/21/1999 FOLLOW UP CODE VIOLATION FGREER Approved VIOLATION

Completed Activity Special Conditions

Case Description - RES: BUILDING W/O PERMIT
Case Number - T98VL00461
Case Status: CLOSED
Total Completed Case Activity Conditions: 1
Date Name
12/28/1998 12/25/98 NOTICE AND ORDER INDEMNIFICATION SIGNED @ SITE BY ANDREW PONGRATZ (OWNER). A FIRE OCCURRED ON 12/25/98 & DAMAGED THE SOUTH HALF OF THE DUPLEX. THE FOLLOWING BURNED: ROOF, CEILING, DRYWALL ON ROOF, & ENTIRE ELECTRICAL SYSTEM. THE UTILITIES (GAS & ELEC) WERE DISCONNECTED. NORTH HALF OF THE DUPLEX BEING WIRED (POSSIBLY WITHOUT PERMITS). CONTACTOR SECURED BUILDING FROM UNAUTHORIZED ENTRY. 12/31/98 NOTICE & ORDER INDEMNIFICATION FOLLOW UP REQUEST. PER E. MONAHAN, DSC WILL INCURR COSTS ($52.28) OF CALL OUT (WMJ INVOICE 3848) DUE TO OWNERS SHOWING UP IN THE INTERIM OF THE CONTRACTOR APPEARING @ THE SITE. OWNERS SECURED PROPERTY. 3-3-99 T99CM00911 OBTAINED - CLOSE INSPECTION 08/17/99 PER E.O. DURAZO, CASE OPENED AND FOLLOW-UP SCHEDULED FOR 09/20/99. (ARCHITECT INVOLVED) 09/20/99 PER INSPECTOR R. CHAVEZ BUILDING SECURE, FOLLOW UP SCHEDULED FOR 12/20/99. 12/21/99 BUILDING SECURE PER INSPECTOR F GREER. FOLLOW UP SCHEDULED 03/21/00. 03/23/00 BUILDING SECUER PER INSPECTOR F GREER. 120-DAY FOLLOW UP SCHEDULED FOR 07/24/00.

Documents

File Name Document Type  
None DOCUMENTS VIEW