Case Details

Status:

Closed - Resolved

Type:

Refuse, debris in alley remodeling without permit
Address:

Entered Date:

08/15/2022

Applicant:

N/A

Description:

Completed Inspections

Case Status: Closed - Resolved
Case Number: T22DV04729
Case Description: Refuse, debris in alley remodeling without permit
Total Completed Inspections - 2
End Date Description Inspector Results Comments
04/25/2023 COT - ENFC - Code Enforcement - Follow Up Passed FOLLOW UP INSPECTION FOUND THAT PERMITS APPLIED FOR IN AUGUST 2022 HAVE BEEN COMPLETED. PERMIT FOR THE RESIDENTIAL REMODEL IS NOW IN ISSUED STATUS AND SINCE MARCH 10TH OF 2023 AND WORK IN PROGRESS. THE ROW PERMIT ALSO HAS BEEN GIVEN A NEW PERMIT NUMBER AND IN ISSUED STATUS. WAITING PROCESS FOR NEW PERMIT HAS BEEN APPROXIMATELY 5 MONTHS. C/E HAS NO FURTHER ISSUES, PERMITS HAVE BEEN SECURED. COMPLIANCE / CLOSE CASE.
10/13/2022 COT - ENFC - Code Enforcement - Initial Passed {Activity date: 10/13/2022; Status: Approved; Inspector: GOODMAN; Comment: Entered by GOODMAN - } INSPECTION FOUND PERMITS HAVE BEEN APPLIED FOR A RESIDENTIAL REMODEL PERMIT AND A RIGHT OF WAY PERMIT. WINDOWS HAVE ALREADY BEEN REPLACED AND PART OF THE COMPLAINT WAS FOR THE INSTALLATION OF THE WINDOWS, A ROOM EXTENTION AND OTHER WEATHER DETERIORATED STUCCO AREAS. SOME INTERIOR WORK HAS BEEN COMPLETED, CABINETS REMOVED. WOOD FLOORING PATCHED, STUCOO PATCHED AND RETEXTURED, WORK STARTED ON THE EXTENTION. BECAUSE OF THE NEW ENERGOV SYSTEM WORK HAS STOPPED, NEW PERMITS BEING ISSUED IN THE SYSTEM REPLACING PERMITS PLUS. CONTRACTOR STATING HE IS WATING FOR PERMITS TO BE REISSUED,

Scheduled Inspections

SCase Number - T22DV04729
Case Status: Closed - Resolved
Case Description:
Scheduled Date Description Inspector Status
COT - ENFC - Code Enforcement - Initial Scheduled