Case: T22DV03879
Case Details
Entered Date:
07/11/2022
Applicant:
DEMPSHER DEVON
Description:
HOUSE FIRE
Outstanding Inspections
Case Number: T22DV03879
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| INSP - FOLLOW UP CODE ENFORCE | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T22DV03879
Case Description: EMERGENCY
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2022 | INSP - INITIAL CODE ENFORCMENT | TIDWELL | Approved | FIRE TO THE 10X12 ATTACHED WOOD FRAMED REAR PATIO. 4 BIRDS BOARDS WERE DESTROYED. THERE WAS PAINT BLISTERING TO THE RAFTERS, DECKING AND MEMBERS. THE DECKING ABOVE THE EAST WALL HAS CHARRING AND DEEP CRACKS. THERE IS ONE 6X7 SLIDER THAT HAS A SHATTERED OUTER PANE. THERE WAS SHEET ROCK DAMAGE TO THE DINING ROOM FROM MULTIPLE INSPECTION HOLES TO THE CEILING. ELECTRICAL: THERE IS HEAT DAMAGE TO THE EXTERIOR PATIO OUTLET. THE EXTERIOR LIGHT FIXTURE SUSTAINED HEAT DAMAGE. THERE IS MULTIPLE BARE CONDUCTORS INSIDE THE WALL CAVITIES ABOVE THE EAST WALL. PLUMBING: N/A MECHANICAL: SMOKE DAMAGE REMARKS: PERMITS REQUIRED FOR REPAIRS. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T22DV03879
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 07/11/2022 | CONTACTED IN PERSON |
| 07/11/2022 | NOTICE AND ORDER ISSUED |
| 07/11/2022 | STRUCTURE SECURED BY ??? |
| 07/11/2022 | CALLBACK |