East side of lot, zoned HO-3, being used as builder's yard.Heavy machinery, multiple shipping containers, building materials stored on site. Also an RV is on site and is occupied.09/15/2022 M.R. issue continues on lot, owner is still doing construction
Address:
Entered Date:
04/29/2022
Applicant:
N/A
Description:
Case Violations
Case Number: T22DV02715
Case Status: Citation
Case Description: East side of lot, zoned HO-3, being used as builder's yard.Heavy machinery, multiple shipping containers, building materials stored on site. Also an RV is on site and is occupied.09/15/2022 M.R. issue continues on lot, owner is still doing construction
Total Violations: 1
Violation Date | Code Statue |
---|---|
09/21/2022 | UDC Sec. 10.2.1 COMPLIANCE REVIEW, PROPOSED DEVELOPMENT No land may be used or occupied; no site improvement, modification, or construction started; no existing use or structure expanded, reconstructed, changed, or otherwise altered; and no land may be divided into multiple parcels until compliance with the provisions of the UDC has been certified through a zoning review process by PDSD. No City agency may issue a permit for excavation, grubbing, grading, paving, demolition, or construction of any sort before certification of compliance with provisions of the UDC has been determined by PDSD. In the event a zoning regulation requires interpretation, such interpretation shall be issued by the Zoning Administrator in accordance with Sections 1.5, Interpretations of the Unified Development Code. |
Completed Inspections
Case Status: Citation
Case Number: T22DV02715
Case Description: East side of lot, zoned HO-3, being used as builder's yard.Heavy machinery, multiple shipping containers, building materials stored on site. Also an RV is on site and is occupied.09/15/2022 M.R. issue continues on lot, owner is still doing construction
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/12/2022 | COT - ENFC - Code Enforcement - Initial | Passed | {Activity date: 09/12/2022; Status: Approved; Inspector: BIGMAN; Comment: Entered by BIGMAN - RESEARCH REQUIRED-vacant lot does not have any approval and owner is not currently working with the Zoning or Building Department. NOV sent out to owner.} |
Scheduled Inspections
SCase Number - T22DV02715
Case Status: Citation
Case Description:
Scheduled Date | Description | Inspector | Status |
---|---|---|---|
12/19/2023 | COT - ENFC - Code Enforcement - Follow Up | Scheduled | |
COT - ENFC - Code Enforcement - Follow Up | Scheduled |
Completed Case Activity
Case Number - T22DV02715
Case Status: Citation
Case Description: East side of lot, zoned HO-3, being used as builder's yard.Heavy machinery, multiple shipping containers, building materials stored on site. Also an RV is on site and is occupied.09/15/2022 M.R. issue continues on lot, owner is still doing construction
Description | Date | Status |
RETURNED MAIL | 10/05/2022 | Passed |