Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T22DV00964
Case Details
Status:
Active
Type:
unit 19 has a new mobile home set up without permits or approvals
Address:
Entered Date:
02/04/2022
Applicant:
N/A
Description:
Completed Inspections
Case Status: Active
Case Number: T22DV00964
Case Description: unit 19 has a new mobile home set up without permits or approvals
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/04/2022 | COT - ENFC - Code Enforcement - Initial | Passed | {Activity date: 02/04/2022; Status: Approved; Inspector: GONZALEZ; Comment: Entered by GONZALEZ - STOP WORK ORDER HAS BEEN POSTED FOR AN APPROX 53 FT MOBILE PLACED ON LOT 19 WITHOUT PERMITS OR APPROVALS FROM THE CITY OF TUCSON. THE MOBILE HOME UNIT IS WITHIN 2 FEET OF THE SERVICE DROP THAT ENERGIZES A 6 PACK SQUARE D ELECTRICAL SERVICE PANEL FOR UNITS 18, 19, 21, AND 22. UNIT 19 ELECTRICAL METER SPACE IS BLANKED OFF AND RED TAG BY TEP. THE LOT HAS A 50 AMP MIDWEST MODEL P-54 PEDESTAL THAT HAS NON METALLIC SHEATH CABLE THAT HAS BEEN CUT AT THE TOP SIDE FITTING. THE MOBILE HOME HAS NON METALLIC SHEATH CABLES SPLICES AND WIRE NUTTED TOGETHER IN A NON CODE COMPLIANT MANNER AT THE UNDER NEATHSIDE OF THE MOBILE HOME. THE MAIN CONDUIT ENTERING THE MOBILE HOME HAS ITS ALUMINUM CONDUCTORS SPLICED OUTSIDE OF ITS CONDUIT LEAVING APPROX 3 FT OF LENGTH NOT PROTECTED FROM THE ELEMENTS. THE SEWER CONNECTION CANNOT BE VERIFIED AT THIS TIME.} |