Case: T22DV00503
Case Details
Entered Date:
01/20/2022
Applicant:
PLASTIC HOLDINGS LLC
Description:
CAR INTO BUILDING
Case Violations
Case Number: T22DV00503
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Violations: 3
| Violation Date | Code Statue |
|---|---|
| 01/20/2022 | REFERENCE |
| 01/20/2022 | T.C. Ch. 16, Sec. 16-12(a) EXTERIOR SURFACES. (1) Weather protection. All weather-exposed exterior surfaces of every building, including windows and doors, shall provide weather protection. Every building shall be weather protected to provide shelter for the occupants against the elements and to exclude moisture and dampness. |
| 01/20/2022 | T.C. Ch. 16, Sec. 16-12(a) (4) WINDOWS, SKYLIGHTS, AND DOORS. Every window, skylight, door and all associated frames, shall be kept in sound condition, repair and weather tight. All glazing materials shall be maintained free from cracks and holes. Every window, other than a fixed window, shall be easy to open and capable of being held in position by window hardware. All window and door hardware shall be maintained in good condition and shall function properly. |
Outstanding Inspections
Case Number: T22DV00503
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| INSP - FOLLOW UP CODE ENFORCE | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T22DV00503
Case Description: EMERGENCY
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/20/2022 | INSP - INITIAL CODE ENFORCMENT | MENDOZA | Approved | VEHICLE COLLIDED INTO FRONT ENTRANCE OF OFFICE BUILDING NO DAMAGE TO LOAD BEARING COMPONENTS OF THE WALL DECORATIVE FRAMED GLASS AND METAL FRAME COMPONENTS DAMAGED AS WELL AS THE IRON DOOR FRAME. PONY WALL RIGHT OF THE WALL HAS BEEN DISLODGED FROM THE FOOTER AND WAS PUSHED IN APPROXIMATELY 6 INCHES NO ELECTRICAL CIRCUITS AFFECTED LIKE FOR LIKE REPAIRS MAY BE MADE AND NO PERMITS REQUIRED FOR COMPLETED REPAIRS CONTRACTOR ON SITE DURING INSPECTION. AREA IS BEING SECURED |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T22DV00503
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 3
| Date | Name |
| 01/20/2022 | CONTACTED BY MAILING |
| 01/20/2022 | CONTACTED BY EMAIL |
| 01/20/2022 | NOTICE OF VIOLATION ISSUED |