Case: T22DV00416
Case Details
Entered Date:
01/15/2022
Applicant:
KELLY PATRICIA L
Description:
Since Aug. 24, 2020 they have welded a mesh gate to the temporary structure (not the wall), installed shelving or tables and just 2 weeks ago were welding gutters to the temporary structure placing the gutter between the wall and the metal roof of the structure to keep the water out. They have also reinforced stronger tie-downs for the metal roofs of the 2 temporary structures they use for their cars in the front of their house and bolted them to the concrete. I mention this because the first 2 temporary structures they used were demolished by a microburst - coverings ripped off and poles twisted, bent and completely pulled out of the concrete. Are temporary structures really safe?
Outstanding Inspections
Case Number: T22DV00416
Case Status: VOID
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Outstanding Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| INSP - INITIAL CODE ENFORCMENT | None | Not Inspected | ||
| INSP - FOLLOW UP CODE ENFORCE | None | Not Inspected |