Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

NOVERIFY

Type:

WORK WITHOUT PERMITS-COMMERCL

Entered Date:

10/27/2021

Applicant:

KRYSTAL POPOV

Description:

Possible indoor farmers market with no operational permit for location (see email); signage on building advertising for 10/30/21. C1 Zoning.

Completed Inspections

Case Status: NOVERIFY
Case Number: T21DV07585
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Completed Inspections - 2
End Date Description Inspector Results Comments
12/28/2021 INSP - INITIAL CODE ENFORCMENT VALDEZ Approved ONSITE BUILDING CLOSED. PEACH PROPERTIES IS MANAGER 520 798-3331. WILL FOLLOW UP WITH PDSD AND MANAGEMENT
01/07/2022 INSP - FOLLOW UP CODE ENFORCE VALDEZ Approved ONSITE WLAKEDTHE UPPER FLOOR WHERE THE CALENDER HAS A NOTATION OF A FARMERS MARKET EVENT FOR 29TH OF JAN 2022. THE LAST APPROVED CERTIFICATE OF OCCUPANCY IS FOR OFFICE USE, NOT RETAIL. WILL SEND NOTICE OF VIOLATION FOR WORKING OUTSIDE THE BOUNDARIES OF THE OFFICE C OF O.

Outstanding Case Activity Conditions

Date Name Approved
01/11/2022 T.C. CH. 6, SEC. 6-34, ORDINANCE #11590 ADOPTING LOCAL AMENDMENTS TO BUILDING CODE EFFECTIVE JANUARY 1, 2019. 2018 INTERNATIONAL BUILDING CODE, PART 2-ADMINISTRATION AND ENFORCEMENT, CHAPTER 1 SCOPE AND ADMINISTRATION. SECTION 111.1 CERTIFICATE OF OCCUPANCY [A] 111.1 CHANGE OF OCCUPANCY. A BUILDING OR STRUCTURE SHALL NOT BE USED OR OCCUPIED, AND A CHANGE OF OCCUPANCY OF A BUILDING OR STRUCTURE OR PORTION THEREOF SHALL NOT BE MADE, UNTIL THE BUILDING OFFICIAL HAS ISSUED A CERTIFICATE OF OCCUPANCY THEREFOR AS PROVIDED HEREIN. ISSUANCE OF A CERTIFICATE OF OCCUPANCY SHALL NOT BE CONSTRUED AS AN APPROVAL OF A VIOLATION OF THE PROVISIONS OF THIS CODE OR OF OTHER ORDINANCES OF THE JURISDICTION. EXCEPTION: CERTIFICATES OF OCCUPANCY ARE NOT REQUIRED FOR WORK EXEMPT FROM PERMITS IN ACCORDANCE WITH SECTION 105.2. CITY OF TUCSON UNIFIED DEVELOPMENT CODE ARTICLE 10: ENFORCEMENT AND PENALTIES 10.2 ENFORCEMENT AUTHORITY 10.2.3. COMPLIANCE REVIEW, EXISTING DEVELOPMENT ANY LAND USED OR OCCUPIED; ANY SITE IMPROVEMENT, MODIFICATION, OR CONSTRUCTION STARTED; ANY EXISTING USE OR STRUCTURE EXPANDED, RECONSTRUCTED, CHANGED, OR OTHERWISE ALTERED; AND ANY LAND DIVIDED INTO MULTIPLE PARCELS WITHOUT CERTIFICATION OF COMPLIANCE WITH THE PROVISIONS OF THE UDC THROUGH A ZONING REVIEW PROCESS IS CONSIDERED A VIOLATION OF THE UDC. ENFORCEMENT OF VIOLATIONS SHALL BE IN ACCORDANCE WITH SECTION 10.4, PENALTIES AND REMEDIES Not Approved

Completed Activity Special Conditions

Case Description - WORK WITHOUT PERMITS-COMMERCL
Case Number - T21DV07585
Case Status: NOVERIFY
Total Completed Case Activity Conditions: 1
Date Name
12/28/2021 CONTACTED BY PHONE