Case: T21DV06983
Case Details
Entered Date:
10/06/2021
Applicant:
LIBNAN LLC
Description:
FIRE
Case Violations
Case Number: T21DV06983
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Violations: 3
| Violation Date | Code Statue |
|---|---|
| 10/06/2021 | T.C. Ch. 16, Sec. 16-11(c) ELECTRICAL SYSTEM. (1) All dwellings and dwelling units shall be provided with electrical service. Electrical facilities connected to or in any building or structure are to be maintained hazard-free and in a state of good repair. The electrical system shall be free from such hazards as bare wiring; overloaded circuits or services; equipment not properly grounded; over-fused circuits; misuse of wiring, including the use of extension cords in lieu of permanent wiring; non-approved wiring; and wiring exposed to moisture or extreme heat. Broken, loose, frayed, inoperable, defective or missing portions of the electrical service, lines, switches, outlets, fixtures and fixture coverings shall be repaired or replaced. (2) All electrical equipment, wiring and appliances shall be installed and maintained in a safe manner and in accordance with all applicable laws. |
| 10/06/2021 | T.C. Ch. 16, Sec. 16-11(f)(5) All interior coverings, finishes, surfaces including walls, ceilings and floors shall be maintained in a good, clean and sanitary condition. Peeling, chipping, flaking or abraded paint shall be repaired, removed or covered. All walls, ceilings or floors shall be free from holes, breaks and loose or rotting materials. Cracked or loose plaster, wallboard, decayed wood or other defective surface conditions shall be corrected. |
| 10/06/2021 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Completed Inspections
Case Status: COMPLIAN
Case Number: T21DV06983
Case Description: EMERGENCY
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2021 | INSP - INITIAL CODE ENFORCMENT | LOPEZ | Approved | Was called out by communications to assist Tucson fire after arriving found that electrical fire in the kitchen outlets, isolated at the main breaker panel ( damages electrical outlet and wire in the kitchen, will also need a metal safty shield cover in breaker panel and also needs labeling ) will be issuing notice to have licensed electrician check electrical in the kitchen and at the panel where the breaker burned, Home was not condemned. |
| 03/21/2022 | INSP - FOLLOW UP CODE ENFORCE | LOPEZ | Approved | OUTLET REPAIRED, NO PERMIT NEEDED, WILL BE CLOSING CASE. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T21DV06983
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
| Date | Name |
| 10/06/2021 | CONTACTED BY MAILING |
| 10/06/2021 | NOTICE OF VIOLATION ISSUED |