Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T21DV06746
Case Details
Entered Date:
09/24/2021
Applicant:
CH REALTY VIII-TH MHC TUCSON LA PLATA LLC: CORPORATION SERVICE COMPANY
Description:
MAIN SERVICE DAMAGED
Case Violations
Case Number: T21DV06746
Case Status: REFERRED
Case Description: EMERGENCY
Total Violations: 1
| Violation Date | Code Statue |
|---|---|
| 09/24/2021 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Completed Inspections
Case Status: REFERRED
Case Number: T21DV06746
Case Description: EMERGENCY
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2021 | INSP - INITIAL CODE ENFORCMENT | VALDEZ | Approved | EMERGENCY CALL OUT BY TPD: A VEHICLE HIT AND PULLED THE SERVICE DROP A WHICH CAUSED TEP POLE TO FALL AND TO DAMAGE THE SERVICE AND STRUCTURE TO THE MOBILE HOME PARK. THE DAMAGE WHICH OCCURRED TO THE MAIN SERVICE LAST NIGHT. THE SERVICE MAKEUP IS (3) 200 AMP PANELS WITH A CT TRANSFORMER, THIS EQUIPMENT IS MOUNTED ON A WOOD FRAMED STRUCTURE WHICH CURRENTLY HAS BROKEN POSTS AND UNABLE TO SUPPORT ITSELF. TUCSON POWER AND ELECTRIC DID DISCONNECT POWER LAST NIGHT. I HAVE AUTHORIZED THE OWNERS CONTRACTOR TO PROVIDE STABILITY TO THE STRUCTURE TO PREVENT A FALL. I HAVE SPOKEN TO TUCSON POWER AND ELECTRIC AND ADVISED THEM THAT PRIOR TO RE-ENERGIZING THE SYSTEM A CLEARANCE IS REQUIRED FROM THE CITY OF TUCSON. REQUIREMENTS: ENGINEERING IS REQUIRED FOR A NEW STRUCTURE AND ELECTRICAL EQUIPMENT, ONCE THE CITY APPROVES THE PLANS A PERMIT SHALL BE ISSUED. |
| 09/28/2021 | INSP - FOLLOW UP CODE ENFORCE | VALDEZ | Approved | ONSITE NO ISSUES WITH THE SERVICE REPAIR |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T21DV06746
Case Status: REFERRED
Total Completed Case Activity Conditions: 7
| Date | Name |
| 09/24/2021 | CONTACTED BY PHONE |
| 09/24/2021 | CONTACTED IN PERSON |
| 10/15/2021 | RETURNED MAIL |
| 10/20/2021 | CONTACTED BY EMAIL |
| 09/24/2021 | NOTICE OF VIOLATION ISSUED |
| 08/30/2022 | VIOLATION CLOSED |
| 09/24/2021 | STRUCTURE SECURED BY ??? |