Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T21DV05291
Case Details
Entered Date:
08/12/2021
Applicant:
R & M REAL ESTATE LTD PARTNERSHIP LLP CARL KARACHER ENTERPRISES INC ATTN: TAX DE
Description:
Object on precipice of riverbank (soon to be in riverbed)must be as a result of hosing down Carl's Jr parking lot. Close up will follow.
Outstanding Inspections
Case Number: T21DV05291
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| INSP - FOLLOW UP CODE ENFORCE | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T21DV05291
Case Description: MULTIPLE TYPES
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2021 | INSP - INITIAL CODE ENFORCMENT | GOODMAN | Approved | I VISITED SITE, CARLS JR PARKING LOT HAS ALWAYS HAD A CONGRETE CULVERT THAT WAS CUT INTO THE ASPHALT A SECTION ON BOTH THE NORTH AND SOUTH SIDES CONNECTED WITH A SECTION ON THE EAST SIDE, WATER FROM THE RED LION INN AS WELL AS CARLS JR COLLECTS AND RUNS DOWN THE SOUTH SIDE. WHETHER ITS RAIN OR THEY WASH THE PARKING LOT, ALL WATER RUNS OFF INTO THE SANTA CRUZ RIVER. THE CONCRETE POURED ON THE BANK OF THE RIVER ELIMINATES WATER FROM WASHING AWAY THE BANK. I AM NOT REALLY SURE WHAT THE COMPLAINTANT IS GETTING AT, BUT I SEE NO ISSUES WHILE ON SITE. COMPLIANCE / CLOSE CASE. |