Status:

COMPLIAN

Type:

MULTIPLE TYPES

Entered Date:

04/26/2021

Applicant:

LEGACY TRADITIONAL SCHOOL EAST TUCSON

Description:

School construction may be occuring after allowed times in residential areas, including Sunday, and exceeding noise limits and/or after allowed times. Noise includes trucks, construction, foul language, music, etc. (W2)

Outstanding Inspections

Case Number: T21DV02424
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
INSP - FOLLOW UP CODE ENFORCE None Not Inspected

Completed Inspections

Case Status: COMPLIAN
Case Number: T21DV02424
Case Description: MULTIPLE TYPES
Total Completed Inspections - 1
End Date Description Inspector Results Comments
05/21/2021 INSP - INITIAL CODE ENFORCMENT GOODMAN Approved VISITED SITE, CONTRACTOR IS CANYON CONSTRUCTION AND DESIGN. MET THE SUPERINTENDENT WHO STATED THAT EARLY ON IN THE PROJECT HE HAD BEEN RECEIVING CALLS FROM THE SURROUNDING NEIGHBORS AND HE TRIED TO FIELD ALL THOSE CALLS AND INFORM PEOPLE WAS WAS GOING ON WHAT WAS GOING TO HAPPEN ETC... HE FELT PEOPLE WERE MORE UPSET THAT THE BUILDING WAS TAKING PLACE. THE PROJECT TAKES UP A VERY LARGE AMOUNT OF LAND, THERE IS A THREE STORY BUILDING THAT WILL BE A SCHOOL. THEY ARE IN THE PROCESS OF COMPLETING THE BUILDING AND POURING CONCRETE FOR THE SIDEWALKS, AND SMALL OUT BUILDINGS. I FOUND THERE TO BE NO YELLING OR CUSSING, LOUD MUSIC WAS COMING FROM DUTCH BROS ACROSS THE WAY. THERE IS ALL TYPES OF HEAVY EQUIPMENT; TRACTORS, CEMENT TRUCKS REACH LIFTS. CRANES THRU OUT THE DAY, SO ANY ONE SHOULD EXPECT IT TO BE LOUD ON THIS JOB SITE. THERE ARE NO EARLY MORNING STARTS. GATES OPEN AT 6 AM, WORK STARTS REALLY AT 6:15 - 6:30 AM. CODE ENFORCEMENT HAS NO ISSUES WITH THE FINDINGS OF SUCH A LARGE CONSTRUCTION SITE. BY JULY THE WORK WILL MOVE INSIDE THE STRUCTURE. NO VIOLATIONS. COMPLIANCE / CLOSE CASE.