Case: T21DV01199
Case Details
Entered Date:
03/03/2021
Applicant:
GUALTIERI PAUL & GUADALUPE CP/RS
Description:
stop work order installation of hvac system
Completed Inspections
Case Status: COMPLIAN
Case Number: T21DV01199
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2021 | INSP - INITIAL CODE ENFORCMENT | GONZALEZ | Approved | UPON ARRIVAL THERE IS A HVAC SYSTEM AT THE ROOF TOP OF THE SOUTHWEST CORNER BUILDING LOCATED AT PARCEL 106-04-147E. CURRENTLY THERE IS NO PERMITS OR APPROVALS FROM THE CITY OF TUCSON FOR THE INSTALLATION OF A HVAC SYSTEM IN SUBSTITUTE OF THE ORIGINAL EVAPORATIVE SWAMP COOLER. A STOP WORK ORDER HAS BEEN ISSUED AND POSTED ALONG WITH A STOP WORK ORDER PLACARD AT THE FRONT DOOR ENTRANCE OF THE BUILDING WITH THE HVAC SYSTEM MOUNTED AT THE ROOF TOP. THIS IS THE SECOND STOP WORK ORDER THAT HAS BEEN ISSUED AT THE PROPERTY DUE TO THE SAME OWNER FAILING TO OBTAIN REQUIRED PERMITS AND APPROVALS FROM THE CITY OF TUCSON. |
| 11/10/2021 | INSP - FOLLOW UP CODE ENFORCE | GONZALEZ | Approved | HVAC UNIT HAS BEEN REMOVED FROM THE ROOF, CLOSING CASE. SERVICE OF ISSUED CITATION WAS NOT PERFECTED VIOLATION ABATED. |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T21DV01199
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 7
| Date | Name |
| 08/05/2021 | RETURNED MAIL |
| 03/09/2021 | CONTACTED BY MAILING |
| 03/03/2021 | CONTACTED BY EMAIL |
| 03/03/2021 | NOTICE OF VIOLATION ISSUED |
| 03/03/2021 | CITATION ISSUED |
| 11/17/2021 | VIOLATION CLOSED |
| 03/09/2021 | COURT HEARING INFO |