Case: T21DV00771
Case Details
Entered Date:
02/11/2021
Applicant:
CAROLLYNN A AYCOCK REVOC FAMILY TR
Description:
WORK WITHOUT PERMITS - BUILDING ADDITION TO HOUSE AND ATTACHING TO PROPERTY WALL ON WEST SIDE OF PROPERTY
Case Violations
Case Number: T21DV00771
Case Status: COURTCMP
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Violations: 3
| Violation Date | Code Statue |
|---|---|
| 02/22/2021 | REFERENCE |
| 02/22/2021 | UDC, Sec. 10.2.3. COMPLIANCE REVIEW, EXISTING DEVELOPMENT Any land used or occupied; any site improvement, modification, or construction started; any existing use or structure expanded, reconstructed, changed, or otherwise altered; and any land divided into multiple parcels without certification of compliance with the provisions of the UDC through a zoning review process is considered a violation of the UDC. Enforcement of violations shall be in accordance with Section 10.4, Penalties and Remedies. |
| 02/22/2021 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
Completed Inspections
Case Status: COURTCMP
Case Number: T21DV00771
Case Description: WORK WITHOUT PERMITS-RESIDENTL
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/22/2021 | INSP - INITIAL CODE ENFORCMENT | MENDOZA | Approved | MASONRY ADDITION BUILT AT THE SOUTH EAST PORTION OF THE MAIN STRUCTURE. IS BUILT TO THE PROPERTY LINE WITH A ZERO SETBACK AND BUILT ON TOP OF THE EXISTING MASONRY WALL. ALSO HAS A MINI SPLIT SYSTEM INSTALLED ON THE ROOF OF THE ADDITION |
| 12/28/2021 | INSP - FOLLOW UP CODE ENFORCE | MENDOZA | Approved | OWNER HAS BEGUN TO REMOVE THE STRUCTURE. FIVE COURSES OF BLOCK ON THE SOUTH AND EAST PORTION OF THE WALL STILL NEEDS TO BE REMOVED |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-RESIDENTL
Case Number - T21DV00771
Case Status: COURTCMP
Total Completed Case Activity Conditions: 8
| Date | Name |
| 07/08/2021 | CONTACTED BY PHONE |
| 02/22/2021 | CONTACTED BY MAILING |
| 04/27/2021 | CERTIFIED RECEIPT CARD |
| 02/22/2021 | NOTICE OF VIOLATION ISSUED |
| 04/19/2021 | CITATION ISSUED |
| 05/04/2022 | VIOLATION CLOSED |
| 04/19/2021 | COURT HEARING INFO |
| 07/08/2021 | RESEARCH |