Case: T20DV06190
Case Details
Entered Date:
09/12/2020
Applicant:
RANDOLPH PLAZA II LLC
Description:
car hit building column at business store front at north elevation.
Completed Inspections
Case Status: COMPLIAN
Case Number: T20DV06190
Case Description: EMERGENCY
Total Completed Inspections - 3
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/12/2020 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | Communication called that T.P.D. on site with a car into building. Arrived at the address given and the incident was at another location. The officer for Fry's was on site and did call the accident in and took me to the site damaged. Did go to this address and the wood frame column was pushed in off the wood bottom plates. The vehicle has left the site and they have a video of the vehicle leaving the site. This column was framed around the steel post that supported the steel I-Beam. There was no damage to the steel post inside the column. Did have bees inside the wood frame with honey approx. 6'' to 8" in height in the areas where the hive has been for a long time. The honey was pulled outside the column and left outside the frame. Did make an inspection hole approx. 6' high and the steel post was OK at that height. Did have a masonry wainscott up approx. 3' in height and that was damaged or has fallen to the ground. The business in the area was not responsible for the damage due to was on the exterior of the building of the business. Did call the property manager for the property and left a message. Did call Biff Baker Fence to surround the area due to the wood column is loose at the top. Did the N.O.V. and posted it on the glass in the area. The business remained opened. RV. |
09/12/2020 | INSP - INITIAL CODE ENFORCMENT | GONZALEZ | Approved | UPON ARRIVAL A VEHICLE HIT THE BUILDING'S COLUMN AT BUSINESS STORE FRONT AT NORTH ELEVATION. 1X1 INSPECTION HOLE HAS BEEN MADE AT APPROX. 6FT FROM THE GROUND AND AT THE BASE, THE WOOD FRAME DECORATIVE COLUMN COVERING THE INNER STEEL POST HAS NOT BEEN AFFECTED. THE COLUMN IS CONSTRUCTED OF 2X4 WOOD FRAMING WITH O.S.B. SHEARING COVERED WITH WIRE AND STUCCO, AND A CONCRETE TILE WAINSCOT. THIS DECORATIVE COLUMN HAS BEEN PUSHED BACK APPROX. 1 FOOT FROM THE ORIGINAL POSITION. THE BUILDING'S FAĆADE AND THE WALKWAY'S CEILING HAVE NO SIGNS OF CRACKING OR SHIFTING. NO ELECTRICAL OR PLUMBING HAS BEEN AFFECTED, PERMIT IS REQUIRED FOR THE COMMERCIAL REPAIR. UNSUCCESSFUL ATTEMPTS TO COMMUNICATE WITH PROPERTY MANAGEMENT AND OWNER, LED TO CITY'S FENCE CONTRACTOR TO BE CONTACTED TO SECURE THE IMPACT AREA FROM PEDESTRIAN FOOT TRAFFIC. CONTRACTOR INSTALLED 7 FENCE PANELS WITH 7 POST AND 6 STANDS. |
09/15/2020 | INSP - FOLLOW UP CODE ENFORCE | VIDAL | Approved | The site is secured and at this time the case will be closed and the property manager was working on getting the contractor to make the needed repairs. Violation Abated, Close Case. RV. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T20DV06190
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
Date | Name |
09/12/2020 | CONTACTED BY PHONE |
09/12/2020 | NOTICE OF VIOLATION ISSUED |
02/19/2021 | SEC LEIN PLACED ON PROPERTY IN THE AMOUNT OF ??? |
09/12/2020 | STRUCTURE SECURED BY ??? |