Case: T20DV05636
Case Details
Entered Date:
08/14/2020
Applicant:
INSANIC ALIJA & EMILA CP/RS
Description:
HOUSE FIRE
Completed Inspections
Case Status: COMPLIAN
Case Number: T20DV05636
Case Description: EMERGENCY
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2020 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | The supervisor Martin Romero called that T.F.D. on site with a house fire and was a group home. Arrived and the units were starting to clean up and were checking for hot spots. The fire appears to have started at the rear porch and burned into the house. The master bathroom was burned in the ceiling area inbetween the rafters and went through the hallway into the other bedrooms and released smoke through the front overhang. The fire burned through the roof making a hole approx. 4' x 8' wide and has burning on the rafters and the sheathing. The bathroom in the master bedroom appears to not have a exhaust fan in the ceiling. Holes were made in the ceilings in other rooms to check for fire. On the porch, there was a plastic box that burned on the concrete slab and burned into the rafters into the house. The bathroom window has broken glass on the exterior and the interior portion of a double pane window is still intact. The major damage was in the master bedroom and the master bathroom. The rafters will need to be checked with the sheathing in the path of the of the smoke from the rear of the house to the front of the house. Approx. 12' wide front to rear of the house. There is smoke damage to other parts of the house but is light. The wood rafters have charring in the master bedroom and the master bathroom with smoke damage to the other parts of the rafters in the front of the house. The electrical and the gas was removed at the meters due to the damage of the fire. The son of the owner was on site and signed the paperwork due to the owners were not understanding due to from Bulgaria. The son was going to secure the house once the Redcross completes the interview for placement. Did place a Do Not Enter on the front window and the son had already called a contractor and he was on site. The contractor was going to cover the hole on the roof. Redcross was on site and was interviewing the owners for placement. The son signed the paperwork and left the site. The son will be calling the insurance once they are done with the interview with the Redcross due to was translating for the owners. RV. |
| 01/25/2022 | INSP - FOLLOW UP CODE ENFORCE | VIDAL | Approved | The permits have been issued for the damage to be repaired or replaced with new. T20CM06234 issued on 10-19-2020 for the demo for the inspection to be done to check the wood framing. T20CM07153 issued on 11-25-2020 for the fire damage to be repaired. At this time the case will be closed. Violation Abated, Close Case. RV. |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T20DV05636
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
| Date | Name |
| 08/14/2020 | NOTICE OF VIOLATION ISSUED |
| 08/14/2020 | STRUCTURE SECURED BY ??? |