Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T20DV05013
Case Details
Entered Date:
07/23/2020
Applicant:
GALINDO PROPERTY MANAGEMENT LLC
Description:
Smoke shop opening at location of previous tire shop without zoning approval or issued C of O.
Completed Inspections
Case Status: COMPLIAN
Case Number: T20DV05013
Case Description: COMMERCIAL ZONING
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/24/2020 | INSP - INITIAL CODE ENFORCMENT | SLAIWA | Approved | ON SITE, SPOKE TO BOTH THE TENANT " SMOKE SHOP OWNER" AND THE OWNER, ADVICE NEED TO PROVIDE THE C OF O FOR THIS PROPERTY, OWNER PROVIDED DOCUMENTS, WILL BE DECIDED BY THE PDSD. |
12/09/2020 | INSP - FOLLOW UP CODE ENFORCE | SLAIWA | Approved | DUE TO TENANT "OWNER OF THE SMOKE SHOP" ALREADY MOVED OUT DISMISSING THIS CASE AND CLOSING THE CASE. |
Outstanding Case Activity Conditions
Date | Name | Approved |
07/29/2020 | T.C. CH. 6, SEC. 6-34, ORDINANCE #11590 ADOPTING LOCAL AMENDMENTS TO BUILDING CODE EFFECTIVE JANUARY 1, 2019. 2018 INTERNATIONAL BUILDING CODE, PART 2-ADMINISTRATION AND ENFORCEMENT, CHAPTER 1 SCOPE AND ADMINISTRATION. SECTION 111.1 CERTIFICATE OF OCCUPANCY [A] 111.1 CHANGE OF OCCUPANCY. A BUILDING OR STRUCTURE SHALL NOT BE USED OR OCCUPIED, AND A CHANGE OF OCCUPANCY OF A BUILDING OR STRUCTURE OR PORTION THEREOF SHALL NOT BE MADE, UNTIL THE BUILDING OFFICIAL HAS ISSUED A CERTIFICATE OF OCCUPANCY THEREFOR AS PROVIDED HEREIN. ISSUANCE OF A CERTIFICATE OF OCCUPANCY SHALL NOT BE CONSTRUED AS AN APPROVAL OF A VIOLATION OF THE PROVISIONS OF THIS CODE OR OF OTHER ORDINANCES OF THE JURISDICTION. EXCEPTION: CERTIFICATES OF OCCUPANCY ARE NOT REQUIRED FOR WORK EXEMPT FROM PERMITS IN ACCORDANCE WITH SECTION 105.2. CITY OF TUCSON UNIFIED DEVELOPMENT CODE ARTICLE 10: ENFORCEMENT AND PENALTIES 10.2 ENFORCEMENT AUTHORITY 10.2.3. COMPLIANCE REVIEW, EXISTING DEVELOPMENT ANY LAND USED OR OCCUPIED; ANY SITE IMPROVEMENT, MODIFICATION, OR CONSTRUCTION STARTED; ANY EXISTING USE OR STRUCTURE EXPANDED, RECONSTRUCTED, CHANGED, OR OTHERWISE ALTERED; AND ANY LAND DIVIDED INTO MULTIPLE PARCELS WITHOUT CERTIFICATION OF COMPLIANCE WITH THE PROVISIONS OF THE UDC THROUGH A ZONING REVIEW PROCESS IS CONSIDERED A VIOLATION OF THE UDC. ENFORCEMENT OF VIOLATIONS SHALL BE IN ACCORDANCE WITH SECTION 10.4, PENALTIES AND REMEDIES. | Not Approved |
Completed Activity Special Conditions
Case Description - COMMERCIAL ZONING
Case Number - T20DV05013
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
Date | Name |
07/24/2020 | CONTACTED BY PHONE |
07/24/2020 | CONTACTED IN PERSON |
08/11/2020 | RETURNED MAIL |
09/11/2020 | CITATION ISSUED |
12/09/2020 | VIOLATION CLOSED |