Case: T20DV02482
Case Details
Entered Date:
04/14/2020
Applicant:
ROUND-UP RESTAURANT & LOUNGE INC
Description:
Storage and refuse: roofing materials, propane tanks, greenwaste, flammable liquids, trailers, paint materials, desks, shipping container, drums, junk.
Case Violations
Case Number: T20DV02482
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Violations: 1
| Violation Date | Code Statue |
|---|---|
| 04/20/2020 | UDC Sec. 10.2.1. COMPLIANCE REVIEW, PROPOSED DEVELOPMENT No land may be used or occupied; no site improvement, modification, or construction started; no existing use or structure expanded, reconstructed, changed, or otherwise altered; and no land may be divided into multiple parcels until compliance with the provisions of the UDC has been certified through a zoning review process by PDSD. No City agency may issue a permit for excavation, grubbing, grading, paving, demolition, or construction of any sort before certification of compliance with provisions of the UDC has been determined by PDSD. In the event a zoning regulation requires interpretation, such interpretation shall be issued by the Zoning Administrator in accordance with Sections 1.5, Interpretations of the Unified Development Code. |
Completed Inspections
Case Status: COMPLIAN
Case Number: T20DV02482
Case Description: MULTIPLE TYPES
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2020 | INSP - INITIAL CODE ENFORCMENT | SLAIWA | Approved | ON SITE, WHITE CONTAINER, SHED STORAGE, BUILDING MATERIALS AND STORAGE ON VACANT LOT, SPOKE TO THE OWNER AND SENT 10 DAYS NOTICE OF VIOLATIONS TO REMOVE ALL ITEMS FROM PROPERTY. |
| 05/22/2020 | INSP - FOLLOW UP CODE ENFORCE | SLAIWA | Approved | ON SITE, ALL ITEMES ARE REMOVED FROM THE PROPERTY, IN COMPLIANCE AT THE MOMENT. CASE CLOSED. |
Completed Activity Special Conditions
Case Description - MULTIPLE TYPES
Case Number - T20DV02482
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
| Date | Name |
| 04/20/2020 | CONTACTED BY PHONE |
| 04/20/2020 | CONTACTED IN PERSON |
| 04/20/2020 | CONTACTED BY EMAIL |
| 04/20/2020 | NOTICE OF VIOLATION ISSUED |
| 05/22/2020 | VIOLATION CLOSED |