Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T20DV01562
Case Details
Entered Date:
03/03/2020
Applicant:
TOOLE AVENUE PARTNERS III LLC ATTN: STEVE FENTON
Description:
New construction at N/W corner of 7th & Toole Av, dumping concrete water down storm-drain
Outstanding Inspections
Case Number: T20DV01562
Case Status: COMPLIAN
Case Description: ENVIRONMENTAL
Total Outstanding Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
INSP - FOLLOW UP CODE ENFORCE | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T20DV01562
Case Description: ENVIRONMENTAL
Total Completed Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/03/2020 | INSP - INITIAL CODE ENFORCMENT | GOODMAN | Approved | VISITED SITE, MET WITH THE OWNER WHO STATED NOBODY WAS DUMPING CONCRETE DIRECTLY INTO THE STORM DRAIN. A EMPLOYEE FROM CONCRETE CORING STEPPED UP AND STATED THAT HE WAS CUTTING THE CONCRETE, HAD HIS VACCUM TO REMOVE THE WATER FROM THE SAW, A LADY CAME UP AND INFORMED HIM OF THE WATER RUNNING INTO THE STORM DRAIN. THE OWNER TOOK ACTION PROVIDED SAND BAGS TO STOP ANYTHING GOING INTO THE CONCRETE STREET DRAIN AND THEN TODAY ADDED A BAFFEL AT THE PULL DOWN COMMERCIAL DOOR. SO THE CITIZEN MADE THEM AWARE, THEY TOOK ACTION AND ABATED THE SITUATION. TODAYS INSPECTION FOUND NO ISSUES. COMPLIANCE / CLOSE CASE. |