Case Details

Status:

COMPLIAN

Type:

EMERGENCY

Entered Date:

12/09/2019

Applicant:

PMH OFFICE PARTNERS LP

Description:

sewer intake left uncovered and spewing sewage mixing with rain water behind lot #41

Case Violations

Case Number: T19DV09276
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Violations: 1
Violation Date Code Statue
12/27/2019 T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe.

Completed Inspections

Case Status: COMPLIAN
Case Number: T19DV09276
Case Description: EMERGENCY
Total Completed Inspections - 3
End Date Description Inspector Results Comments
12/09/2019 INSP - INITIAL CODE ENFORCMENT BERMUDEZ Approved ON SITE; SEWER PIPE WAS CAPPED OFF, MGT WILL FOLLOW THROUGH WITH PROPER REPAIRS.
12/09/2019 INSP - INITIAL CODE ENFORCMENT BERMUDEZ Approved ON SITE; FOUND DAMAGED SEWER CLEAN OUT, BACKING UP INTO A PUDDLE. MAINT ON SITE ATTEMPTING TO LOCATE AND CAP OFF TO THEN BEGIN REPAIRS, WORKING AGAINST RAIN AND WIND. WILL FOLLOW UP ON CAP OFF ATTEMPT.
12/23/2019 INSP - FOLLOW UP CODE ENFORCE BERMUDEZ Approved ON SITE; SEWER PIPE WAS RAISED AND A BARRIER TO PREVENT DAMAGE WAS TEMP MADE UNTIL ALL REPAIRS ARE FINISHED. WILL RESEARCH FOR PROPER PERMITS FOR REPAIR.

Completed Activity Special Conditions

Case Description - EMERGENCY
Case Number - T19DV09276
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
Date Name
12/27/2019 CONTACTED BY PHONE
12/27/2019 CONTACTED BY MAILING
12/27/2019 CONTACTED BY EMAIL
12/27/2019 NOTICE OF VIOLATION ISSUED
03/12/2020 VIOLATION CLOSED