Case: T19DV08612
Case Details
Entered Date:
11/03/2019
Applicant:
MENDIBLES ROBERT A
Description:
HOUSE FIRE
Outstanding Inspections
Case Number: T19DV08612
Case Status: COMPLIAN
Case Description: EMERGENCY
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| EMERGENCY CALL OUT | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T19DV08612
Case Description: EMERGENCY
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2019 | INSP - INITIAL CODE ENFORCMENT | VALDEZ | Approved | EMERGENCY CALL OUT BY TFD: THERE IS MAJOR FIRE DAMAGE TO THE ROOF ASSEMBLY, TRUSSES AND ROOF PLANKING ALONG WITH INTERIOR WALL FRAMING HAS MAJOR CRACKING. MULTIPLE WINDOW AND DOOR OPENING ALSO DAMAGED BY THE FIRE. ELECTRICAL: SERVICE DROP DID BURN, TEP DID LOOP AND SECURE THE DROP. METER WAS PULLED, INTERIOR ATTIC AREA HAS MULTIPLE DAMAGED MC CABLES. PLUMBING: SWG DID PIN METER OFF MECHANICAL: MAJOR SMOKE DAMAGE IN THE INTERIOR. REMARKS: THE DWELLING WAS CONDEMNED, PERMIT REQUIRED FOR ALL REPAIRS. UNBALE TO ENTER THE DWELLING DUE TO SEVERE ROOF DAMAGE. CITY CONTRACTOR DID BOARD THE ENTIRE DWELLING. INSPECTOR: JUAN VALDEZ DATE 11/03/2019 |
| 11/04/2019 | INSP - FOLLOW UP CODE ENFORCE | VALDEZ | Approved | ALL DOCUMENTS AND PHOTOS IN SIRE,, CLOSE CASE |
Completed Activity Special Conditions
Case Description - EMERGENCY
Case Number - T19DV08612
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
| Date | Name |
| 11/03/2019 | CONTACTED IN PERSON |
| 11/03/2019 | NOTICE AND ORDER ISSUED |
| 11/03/2019 | VIOLATION CLOSED |
| 11/03/2019 | STRUCTURE SECURED BY ??? |
| 11/03/2019 | CALLBACK |